My Bronco Raptor has a build date of 2/17/2023. Last week it was updated on 2/17 to " in production". The original build week was 2/13/2023. The window sticker was released on 2/9/23 and then the estimated build week was 2/16/23 and then the in production day appears to be 2/17/2023. The " in production" green light has been this way since before 2/9/23 when the window sticker was released. I'm pretty sure the actual build started on 2/17/2023. The tracker is still on " in production" with a date of 2/17/2023. I apologize for repeating myself and seeming so long winded, but I was wondering how long a bronco stays in the " production" phase before it is actually built ? I'm on 3 days now, not counting Sunday. Is this normal ?
The other issue I have heard on other forums is that from people who have the same build week is that bronco production is on hold as of right now due to hard top issues. Has anybody heard this ?
Thanks.
The other issue I have heard on other forums is that from people who have the same build week is that bronco production is on hold as of right now due to hard top issues. Has anybody heard this ?
Thanks.